Categories
Activities Cole Family & Friends Holidays Household Mothering Parenting Ryan

Another Thrilling Update

I wish I had a brilliant or at least somewhat exciting update for you, but I don’t. 

We’ve been working on the house, and trying to get everything else done in daily life that must get done, like work, errands, parent, spend time with the boys, etc.  I still haven’t started packing yet, but that is soon to change.  Joe started bringing home boxes the other day, so now that fun chore is on my plate.

I really don’t mind, but there is always way more stuff you realize you have.  I am hoping we can donate or just get rid of the stuff we haven’t used in years, and be done with it.  Like the extra microwave that has been sitting the pantry now, for eight years.  If our microwave ever broke, we had a spare.  Except it hasn’t and we have had a microwave sitting in the pantry for eight years.

I usually blog at night- but I have been so tired physically and mentally, I think I have blogger’s block.  If you don’t see very many posts here in the upcoming weeks, I haven’t dropped off the face of the earth.  But with moving, fixing up the house, and the upcoming holiday season, I’m not sure how much time or motivation I will have to blog.  Please continue to check in- I know I’ll get my blogging mojo back eventually.  🙂  You can find me on Twitter, and I seem to be able to post 140 character items, much easier and regularly than actual blog posts these days.

I pinkie swear I will post pictures of the new house and the progress we have made.  Joe finished painting the boys’ rooms today, and he’s going to start on our bedroom tomorrow.  I placed the carpet order last week, and that should be installed right after Thanksgiving.  We are ordering our engineered hardwood flooring tomorrow.  We have decided on a honey hickory color which is a golden brown- not too dark or light.  We should have it around Thanksgiving.  It has to cure at room temperature for a week, so Joe should be able to install the floor, the beginning of December.

The brand we are getting has a locking system, so there is no need to glue or nail the pieces together.  Joe is optimistic he can install it in a few days, rather than a few weeks.  So it appears we are on schedule to move into the house by the end of December.  Not sure where we will end up having Christmas- in the old house, or the new one, but Ryan is already wondering about the tree this year, and how Santa will find us.  🙂  Cole has just been talking up a storm and telling us he wants Santa to bring him a dump truck.

I’m also trying to plan Ryan’s fifth birthday party, which always sneaks up on me, since it is just two weeks after Christmas.  I booked the venue this year in JULY- so that is set.  Now I just have to get save the dates out to people, and hope I’m not over the number of guests we are allowed to have.  Guess I had better double check on that.  Ryan of course, is just thrilled to be turning five.  I’m wondering where the time went, and how did my ‘baby’ become a little boy, who is just weeks away from being five years-old?

My mom is coming out for a visit the week of Christmas and will be able to spend an entire evening, and the next day with us.  I’m excited for that, and to be able to show her our new house.  Ryan and Cole are excited to bake cookies for Santa with Nana. 

So that is all we have been up to.  Stay tuned for another exciting update in the near future.  🙂

2 replies on “Another Thrilling Update”

Moving is AWFUL…there is always too much stuff and the question of what to do with it.

Good luck: I can’t imagine trying to move and rent a house during the holidays. I’ll be off for 2 weeks in December, so maybe I can come up for a day and help you out.

Hang in there! Eventually it will all get done!

Laminate Flooring Installation

Laminate is called a floating floor because it is not fastened directly to the sub-floor, but rather the planks or squares are attached to each other. Laminate planks and squares use tongue-in-groove connectors or a trademarked locking system that “clicks” the boards together. The floor is held down by shoe molding that is nailed to the baseboards around the perimeter of the room.

Because laminate is a floating floor, sub-floor preparation generally costs less than with other hard surfaces.

There are basically three types of laminate installations:

Glue laminate requires that the glue be manually applied to the tongue and/or groove of each plank during installation.

Glue-less laminates do not require glue, but rather have a trademarked locking system that hooks, snaps or clicks the tongue and groove together to lock the floor into place. The innovation of these “locking systems” has greatly simplified the installation process for laminate floors. These floors can be installed faster with no messy glue clean up, and are able to be used immediately, whereas most glue laminates need to set for 18-36 hours before being walked on.

Pre-glued laminate is a combination of the two methods above and has glue pre-applied by the manufacturer on the tongue and groove that is moistened prior to the planks being clicked together.

http://www.thecanadianflooring.com
The cities we serve include, but are not limited to the following: Ajax | Aurora | Barrie | Brampton | Brantford | Burlington | Etobicoke | Hamilton | King City | Maple | Markham | Milton | Mississauga | Newmarket | North York | Oakville | Orangeville | Oshawa | Pickering | Richmond Hill | Scarborough | Toronto | Vaughan | Whitby | Windsor | Woodbridge

Comments are closed.